Bridge Construction

August 16, 2015

I just visited a project of mine today as the bridge deck was being poured. You can see in this image the automated concrete finishing machine, the concrete pump truck, the two mats of reinforcing steel used for support over the concrete beams and steel deck pans. 

 

 

Please reload

Featured Posts

How to select an Engineering Consultant

December 7, 2015

1/6
Please reload

Recent Posts

August 16, 2015

July 13, 2015

Please reload

Please reload

Search By Tags
Please reload

Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Copyright © 2016 by Richard W Clayborn, P.E.  Civil Engineering for Residential and Commercial Buildings. All rights reserved. Terms of Use

  • w-facebook
  • Twitter Clean